|
BEN LOMOND HIGH SCHOOL TODAY |
|
The front of the school where construction has begun on the new school. |
|
Looking north in front of the school you can see all of the portables that the students will use during the construction. |
|
Looking from the north end towards the gym you can again see the number of portables. |
|
The English wing has been removed and construction has begun on the new school. This is looking from the old student parking lot below the football field. |
|
THE DRAWING OF THE NEW SCHOOL
The front of the school will face south and the main entrance will be on 9th street. The main part of the school will sit directly where the main part the old school stood. |
|
This drawing shows the new school’s design. The right side of the drawing is the front of the school facing south on 9th street. |
|
Ben Lomond High School Today and Tomorrow |